How To Lay Tile Floor In Bathroom

How to Install Bathroom Floor Tile howtos DIY
How to Install Bathroom Floor Tile howtos DIY from www.diynetwork.com
Bathroom with Tile Flooring

Introduction

If you're looking to renovate your bathroom, laying tile flooring is a great way to enhance the room's aesthetics and functionality. Tile flooring is durable, water-resistant, and easy to clean, making it the perfect choice for a bathroom. In this article, we'll guide you through the steps of laying tile flooring in your bathroom. We'll cover everything from preparing the subfloor to laying the tiles, grouting, and sealing. So, let's get started!

Step 1: Prepare the Subfloor

Subfloor Preparation
Before you begin laying tile, you need to prepare the subfloor. Start by removing any old flooring and ensuring that the subfloor is clean, dry, and level. If the subfloor is uneven, use a self-leveling compound to even it out.

Step 2: Measure the Room

Measuring the Room
Measure the length and width of the room to determine how many tiles you'll need. Add an extra 10% to account for any waste or cuts.

Step 3: Plan the Layout

Planning the Layout
Plan the layout of the tiles before you start laying them. Use a chalk line to mark the center of the room, and lay out a row of tiles in both directions to create a grid. Adjust the grid as needed to ensure that the cut tiles are of equal size on both sides of the room.

Step 4: Apply the Thinset

Applying Thinset
Apply a layer of thinset to a small section of the subfloor using a notched trowel. Start at the center of the room and work your way out towards the edges. Only apply as much thinset as you can cover with tiles in 15-20 minutes.

Step 5: Lay the Tiles

Laying the Tiles
Lay the tiles onto the thinset, pressing them firmly into place. Use tile spacers to ensure that the tiles are evenly spaced. Continue this process, working in small sections, until all the tiles are laid.

Step 6: Cut the Tiles

Cutting the Tiles
Use a tile cutter or wet saw to cut tiles to fit around the edges of the room and any obstacles. Measure each tile carefully before cutting to ensure accuracy.

Step 7: Grout the Tiles

Grouting the Tiles
Once the tiles are laid, allow the thinset to dry for 24 hours. Then, mix the grout according to the manufacturer's instructions and apply it to the tiles using a rubber float. Work in small sections, smoothing the grout into the gaps between the tiles.

Step 8: Clean and Seal

Cleaning and Sealing
After the grout has dried for 24 hours, use a damp sponge to clean off any excess grout from the tiles. Allow the grout to cure for another 24 hours before sealing the tiles with a grout sealer.

Conclusion

Laying tile flooring in your bathroom is a great way to enhance the room's aesthetics and functionality. By following these simple steps, you can achieve a professional-looking tile floor that will last for years to come. Remember to prepare the subfloor, measure the room, plan the layout, apply the thinset, lay the tiles, cut the tiles, grout the tiles, and clean and seal the floor. With a little bit of patience and attention to detail, you can lay tile flooring in your bathroom like a pro!